weldinguide.com

all about welding





PWHT for welding under the scope of ASME B31.3

PWHT for welding under the scope of ASME B31.3

Postby James Scrufy » Thu May 30, 2013 3:47 pm

I need to prepare PQR according to ASME B31.3 for qualification of piping welding (SS 316L to SA-333 Gr 6, NPS 14inc, thickness: 26mm), but reviewing the par. 331.2.3 of ASME B31.3 I am not pretty sure if I should do or not PWHT.
James Scrufy
 
Posts: 9
Joined: Tue May 21, 2013 1:41 pm

Re: PWHT for welding under the scope of ASME B31.3

Postby wgadmin » Thu May 30, 2013 3:52 pm

By the AMSE code B31.3, par. 331.2.3(b) it is made clear that when you weld dissimilar materials like a ferritic component (at your case SA-333 Gr 6) and an austenitic component (at your case SS 316L) then the PWHT of welded joint shall be as required for the ferritic material and thus taking into consideration the given piping dimensions it arises that you shall perform PWHT at a temperature range 593 – 649 deg. C as required by the table 331.1.1.
wgadmin
Site Admin
 
Posts: 44
Joined: Wed May 15, 2013 2:53 pm

Re: PWHT for welding under the scope of ASME B31.3

Postby Jubert » Mon Jan 16, 2017 8:44 am

Hello,

Another question here regarding the requirement of PWHT.
What if the line class of piping requires PWHT (regardless of thickness) and the weld between the pipe and reinforcement pad is less 10mm (the throat), does it requires PWHT?
I am just aware that PWHT is being applied only for the through thickness of the pipe. Just need some idea whether PWHT can be waived on the fillet joint between reinforcement pad and pipe for pipe class requiring PWHT.
Jubert
 
Posts: 1
Joined: Mon Jan 16, 2017 8:32 am


Return to Piping welding

Who is online

Users browsing this forum: No registered users and 1 guest